In the project for LLC "Irkutsk Oil Company", we faced the challenge of installing complex technological equipment — receivers, which required special precision and attention to detail due to their significant weight and size.
The following works were carried out within the framework of the project
INSTALLATION OF TECHNOLOGICAL EQUIPMENT: 8 RECEIVERS, EACH WEIGHING BETWEEN 50 TO 160 TONS.
The installation of the receivers was particularly challenging due to their dimensions and the requirements for precision in limited spaces.
INSTALLATION OF METAL STRUCTURES WITH A TOTAL WEIGHT OF ABOUT 500 TONS
This work required high precision and coordination, considering the scale and weight of the structures.